[Feb 12, 2024] Pass C-TS4CO-2021 Review Guide, Reliable C-TS4CO-2021 Test Engine [Q46-Q63]

Share

[Feb 12, 2024] Pass C-TS4CO-2021 Review Guide, Reliable C-TS4CO-2021 Test Engine

C-TS4CO-2021 Test Engine Practice Test Questions, Exam Dumps

NEW QUESTION # 46
Which statement best describes the Query Browser for reporting?

  • A. It is a design studio app that comes as standard SAP Fiori content.
  • B. It is the frontend used to define reports in Analysis for Office.
  • C. It is a desktop browser that integrates with SAP S/4HANA.
  • D. It is available as an additional license product in SAP S/4HANA.

Answer: C


NEW QUESTION # 47
You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receivers for the activity? Note: There are 3 correct answers to this question.

  • A. General ledger account
  • B. Sales order item
  • C. Profit center
  • D. WBS element
  • E. Internal order

Answer: B,D,E


NEW QUESTION # 48
How does SAP S/4HANA determine if a characteristic value is valid in Profitability Analysis?

  • A. By defining the characteristic value as a key figure
  • B. By defining the characteristic value as a value field
  • C. By defining the characteristic value in the check table
  • D. By defining the characteristic value in the field catalog

Answer: C


NEW QUESTION # 49
What are the some of the characteristics of Profit Center Accounting in SAP S4/HANA? Note: There are 2 correct answers to this question.

  • A. It can be used with period and/or cost of sale accounting.
  • B. It can be used in the settlement rule for internal order.
  • C. It is possible to derive the profit center from the segment in configuration.
  • D. It is integrated in the universal journal.

Answer: A,D


NEW QUESTION # 50
You are implementing SAP S/4HANA and you want to run analytical reports off a single data model. Which statement best describes reporting in SAP S/4HANA?

  • A. Reporting on data in real time is difficult, and complex to design.
  • B. Reporting on data is available in real-time at every level of detail.
  • C. Reporting can be either broad and deep for analysis, or speedy and simple, but not both.
  • D. Reporting analytical data is always done in a business warehouse system.

Answer: B


NEW QUESTION # 51
Which of the following statements are applicable to automatic account assignment in SAP S/4HANA? Note:
There are 2 correct answers to this question.

  • A. It can be defined for postings on general ledger accounts of secondary costs type.
  • B. It takes precedence over validation and substitution.
  • C. It can be defined for postings on general ledger accounts of primary costs type.
  • D. It can be overwritten in the application.

Answer: B,C


NEW QUESTION # 52
For which of the following situations would you need to implement the transfer price solution in SAP S4/NANA?

  • A. Parallel price calculation and invoicing are needed to facilitate intercompany reconciliation.
  • B. Parallel accounting is needed in order to be compliant with different accounting principles.
  • C. Parallel costing is needed in order to calculate separate costs of goods manufactured for different accounting principles.
  • D. Parallel variation views of the same logistical flows are needed to differentiate between legal and profit center valuation.

Answer: D


NEW QUESTION # 53
Which of the following statements apply to SAP S/4HANA embedded analytics? Note: There are 2 correct answers to this question.

  • A. It uses core data services (CDS ) views to create virtual data models (VDMs ) for reporting.
  • B. It is hosted on the SAP Cloud Platform and integrate seamlessly on the SAP S4/HANA on the Fiori Launchpad.
  • C. It is the core SAP S4/HANA license and users the same technical stack and user interface.
  • D. It is used by dedicated BI users who need to go beyond the capabilities of Strategic Analysis Tools for reporting.

Answer: A,C


NEW QUESTION # 54
You use a production order with Product Cost by Period and you entered a results analysis key and variance key. How does the system calculate variances in Product Cost by Period?

  • A. Variances = Target costs - Delivery value - WIP
  • B. Variances = Actual costs - Delivery value
  • C. Variances = Actual costs - Delivery value - WIP
  • D. Variances = Target costs - Delivery value

Answer: C


NEW QUESTION # 55
You create alternative CO versions for your controlling area, in addition to version 0. What would you use additional CO versions for? Note: There are 2 correct answers to this question.

  • A. To store different plan data
  • B. To store data of parallel valuation
  • C. To store data of alternative plan costing runs
  • D. To store different budget data

Answer: A,B


NEW QUESTION # 56
You want to determine which operations of the routing should be considered in a product cost calculation.
How do you do this? Note: There are 2 correct answers to this question.

  • A. By marking the Relevance to Costing indicator in the operation
  • B. By defining a usage key in the header of the routing.
  • C. By assigning a cost center to the work center in the operation
  • D. By marking the cost indicator in the control key assigned to the operation

Answer: A,D


NEW QUESTION # 57
You create a new profit center. Which company code(s) is it assigned to by default?

  • A. All company codes to which the profit center standard hierarchy is assigned to.
  • B. All company codes within the controlling area.
  • C. All company codes maintained in your authorization profile.
  • D. All company codes where profit center accounting is activated.

Answer: B


NEW QUESTION # 58
How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.

  • A. Strategy group -> planning strategy -> requirements class -> requirements type
  • B. MRP group -> requirements class -> planning strategy -> requirements type
  • C. Strategy group -> planning strategy -> requirements type
  • D. MRP group -> Strategy group -> planning strategy -> requirements type

Answer: C,D


NEW QUESTION # 59
You are considering using commitment management with internal orders. What do you need to do in the configuration?

  • A. Activate commitment management in both the version and the order type.
  • B. Activate commitment management in the controlling area, the order type, and in individual internal order master data.
  • C. Activate commitment management only in the controlling area.
  • D. Activate commitment management in both the controlling area and the order type.

Answer: D


NEW QUESTION # 60
In a standard system delivery, how many free characteristics can be added to an operating concern?

  • A. Over 150
  • B. 101-150
  • C. 0-70
  • D. 71-100

Answer: C


NEW QUESTION # 61
What are some of the characteristics of SAP Core Data Services (CDS) views? Note: There are 3 correct answers to this question.

  • A. CDS views have no latency.
  • B. CDS views support authorization.
  • C. CDS views have ready-to-use content.
  • D. CDS views duplicate data for reporting efficiencies.
  • E. CDS views are considered system modifications.

Answer: A,B,C


NEW QUESTION # 62
What can you manage via the account assignment category? Note: There are 2 correct answers to this question.

  • A. Costing variant
  • B. Separate sales order stock
  • C. Product cost by sales order
  • D. Valuation of separate sales order stock

Answer: B,D


NEW QUESTION # 63
......