NEW QUESTION # 17
The most important factor resulting in improved job site safety is:
- A. Engineering Controls
- B. Personal Protective Equipment
- C. Situational Awareness
- D. Safety Enforcement
Answer: C
NEW QUESTION # 18
The initial steel condition is important to the NACE Inspector because:
- A. The Inspector may have to reject the Steel
- B. It affects the final appearance after blasting
- C. Less abrasive is need if the mill Scale s gone
- D. If the steel is pitted more coating will be required
Answer: A
NEW QUESTION # 19
When the joint NACE/SSPC abrasive blast cleaning standards are specified, the pictures in SSPC VIS 1 can be used as:
- A. A final conflict resolution method
- B. A general guide
- C. A method to grade surface profile
- D. Pass/fail criteria
Answer: B
NEW QUESTION # 20
It is good practice for the NACE Inspector to have instrument calibration certificates available:
- A. At all times
- B. In the office only
- C. In the field only
- D. Only if the specification requires it
Answer: A
NEW QUESTION # 21
If a Thermoset coating is heated it will:
- A. Harden and retain its hardness when cooled
- B. Soften when heated and retain its softness when cooled
- C. Soften when heated and return to its original hardness when cooled
- D. Harden and return to its original hardness when cooled
Answer: A
NEW QUESTION # 22
When working as a NACE Inspector in a situation where there is a difference of opinion, the Inspector needs to:
- A. Go with the majority opinion
- B. Call the supervisor
- C. Never change his/her mind
- D. Achieve consensus through negotiation
Answer: B
NEW QUESTION # 23
Conventional spray is a good choice when:
- A. High production rates are required
- B. High viscosity coatings are being applied
- C. High transfer efficiency is required
- D. High quality finishes are required
Answer: D
NEW QUESTION # 24
Whenever dissimilar metals must join, the most common practice is to
- A. avoid coating all connected dissimilar metals.
- B. coat all connected dissimilar metals.
- C. provide anodic protection to prevent corrosion.
- D. provide cathodic protection to prevent corrosion,
Answer: B
NEW QUESTION # 25
The NACE Inspector should perform tests for soluble salts:
- A. When specified
- B. After surface preparation
- C. Prior to surface preparation
- D. Prior to coating application
Answer: A
NEW QUESTION # 26
If the project specification DOES NOT state the specific DFT measurement standards, the inspector should use
- A. their best judgment based on similar projects and specifications.
- B. a detailed checklist and document the lack of a standard.
- C. NACE 2/SSPC SP10
- D. a recognized industry standard like SSPC-PA 2 that is broadly accepted
Answer: D
NEW QUESTION # 27
Which is a component that supplies most of the features and functions of the material?
- A. additive
- B. pigment
- C. solvent
- D. binder
Answer: D
NEW QUESTION # 28
Relative humidity is
- A. a measure of the amount of moisture in the air compared to saturation level.
- B. the lowest temperature at which moisture forms on a steel surface.
- C. the highest temperature at which moisture forms on a steel surface.
- D. a measure of the amount of moisture in the air compared to the air temperature.
Answer: A
NEW QUESTION # 29
A magnetic pull-off type gauge is a good choice when:
- A. Accuracy is not required
- B. Performing an adhesion test
- C. When working on non-ferrous metals
- D. When an intrinsically safe tool is required
Answer: D
NEW QUESTION # 30
Polymerization is the process of:
- A. All organic coatings
- B. Monomers joining together
- C. All thermoplastic coatings
- D. Monomers telegraphing
Answer: B
NEW QUESTION # 31
A successful coating inspector must be able to
- A. recommend the appropriate coating technique for the job to the contractor.
- B. advise the coating applicator on how to mix the coating.
- C. look for problems or issues during application.
- D. apply the coating with expert accuracy.
Answer: C
NEW QUESTION # 32
In the event of a conflict between the project specification and the coating manufactures' product data sheet, the Inspector's first course of action should be too:
- A. Use the product data sheet as a guide
- B. Use the job specification as a guide
- C. Call the person who wrote the specification for clarification
- D. Call the coating manufacturer for clarification
Answer: B
NEW QUESTION # 33
Owners hire NACE Inspectors' with the expectation that:
- A. a) and c)
- B. The inspection cost will be offset by an improvement in service life
- C. The Inspector will make a meaningful technical contribution to the job
- D. The Inspector will improve job flow and schedule
Answer: A
NEW QUESTION # 34
......
NACE-CIP1-001 Exam is a valuable credential for individuals who want to demonstrate their knowledge and expertise in coating inspection. Coating Inspector Level 1 certification program is recognized globally and is a requirement for many jobs in the coatings industry. If you are interested in pursuing a career in this field, the NACE-CIP1-001 certification program is an excellent place to start.
The Ultimate NACE NACE-CIP1-001 Dumps PDF Review: https://actualtorrent.pdfdumps.com/NACE-CIP1-001-valid-exam.html