NEW QUESTION # 17
The most important factor resulting in improved job site safety is:

  • A. Engineering Controls
  • B. Personal Protective Equipment
  • C. Situational Awareness
  • D. Safety Enforcement

Answer: C


NEW QUESTION # 18
The initial steel condition is important to the NACE Inspector because:

  • A. The Inspector may have to reject the Steel
  • B. It affects the final appearance after blasting
  • C. Less abrasive is need if the mill Scale s gone
  • D. If the steel is pitted more coating will be required

Answer: A


NEW QUESTION # 19
When the joint NACE/SSPC abrasive blast cleaning standards are specified, the pictures in SSPC VIS 1 can be used as:

  • A. A final conflict resolution method
  • B. A general guide
  • C. A method to grade surface profile
  • D. Pass/fail criteria

Answer: B


NEW QUESTION # 20
It is good practice for the NACE Inspector to have instrument calibration certificates available:

  • A. At all times
  • B. In the office only
  • C. In the field only
  • D. Only if the specification requires it

Answer: A


NEW QUESTION # 21
If a Thermoset coating is heated it will:

  • A. Harden and retain its hardness when cooled
  • B. Soften when heated and retain its softness when cooled
  • C. Soften when heated and return to its original hardness when cooled
  • D. Harden and return to its original hardness when cooled

Answer: A


NEW QUESTION # 22
When working as a NACE Inspector in a situation where there is a difference of opinion, the Inspector needs to:

  • A. Go with the majority opinion
  • B. Call the supervisor
  • C. Never change his/her mind
  • D. Achieve consensus through negotiation

Answer: B


NEW QUESTION # 23
Conventional spray is a good choice when:

  • A. High production rates are required
  • B. High viscosity coatings are being applied
  • C. High transfer efficiency is required
  • D. High quality finishes are required

Answer: D


NEW QUESTION # 24
Whenever dissimilar metals must join, the most common practice is to

  • A. avoid coating all connected dissimilar metals.
  • B. coat all connected dissimilar metals.
  • C. provide anodic protection to prevent corrosion.
  • D. provide cathodic protection to prevent corrosion,

Answer: B


NEW QUESTION # 25
The NACE Inspector should perform tests for soluble salts:

  • A. When specified
  • B. After surface preparation
  • C. Prior to surface preparation
  • D. Prior to coating application

Answer: A


NEW QUESTION # 26
If the project specification DOES NOT state the specific DFT measurement standards, the inspector should use

  • A. their best judgment based on similar projects and specifications.
  • B. a detailed checklist and document the lack of a standard.
  • C. NACE 2/SSPC SP10
  • D. a recognized industry standard like SSPC-PA 2 that is broadly accepted

Answer: D


NEW QUESTION # 27
Which is a component that supplies most of the features and functions of the material?

  • A. additive
  • B. pigment
  • C. solvent
  • D. binder

Answer: D


NEW QUESTION # 28
Relative humidity is

  • A. a measure of the amount of moisture in the air compared to saturation level.
  • B. the lowest temperature at which moisture forms on a steel surface.
  • C. the highest temperature at which moisture forms on a steel surface.
  • D. a measure of the amount of moisture in the air compared to the air temperature.

Answer: A


NEW QUESTION # 29
A magnetic pull-off type gauge is a good choice when:

  • A. Accuracy is not required
  • B. Performing an adhesion test
  • C. When working on non-ferrous metals
  • D. When an intrinsically safe tool is required

Answer: D


NEW QUESTION # 30
Polymerization is the process of:

  • A. All organic coatings
  • B. Monomers joining together
  • C. All thermoplastic coatings
  • D. Monomers telegraphing

Answer: B


NEW QUESTION # 31
A successful coating inspector must be able to

  • A. recommend the appropriate coating technique for the job to the contractor.
  • B. advise the coating applicator on how to mix the coating.
  • C. look for problems or issues during application.
  • D. apply the coating with expert accuracy.

Answer: C


NEW QUESTION # 32
In the event of a conflict between the project specification and the coating manufactures' product data sheet, the Inspector's first course of action should be too:

  • A. Use the product data sheet as a guide
  • B. Use the job specification as a guide
  • C. Call the person who wrote the specification for clarification
  • D. Call the coating manufacturer for clarification

Answer: B


NEW QUESTION # 33
Owners hire NACE Inspectors' with the expectation that:

  • A. a) and c)
  • B. The inspection cost will be offset by an improvement in service life
  • C. The Inspector will make a meaningful technical contribution to the job
  • D. The Inspector will improve job flow and schedule

Answer: A


NEW QUESTION # 34
......


NACE-CIP1-001 Exam is a valuable credential for individuals who want to demonstrate their knowledge and expertise in coating inspection. Coating Inspector Level 1 certification program is recognized globally and is a requirement for many jobs in the coatings industry. If you are interested in pursuing a career in this field, the NACE-CIP1-001 certification program is an excellent place to start.

 